Keerthi Pradhan Logistics Park

Phase 1: Amazon


This is a ware house which is built to suit the client for logistics purpose, it has a internal toilet block and external canteen along with pump rooms, electrical room and a scrap yard. The VDF Floor is polished to make it dust free. It constitutes of number of duct with Dock levelers. It has a periphery wall to a height of 3 Mtr. with windows each side.

Keerthi Pradhan Logistic Park,
Narasapura,
Kolar District.

G S Venkatesh
Engineering Consultant
102-F, #5,6A Cross, Rajmahal Villa Extension,
Sadashivanagar, Bengaluru – 560000.

Mayaskara Civil Solutions,
# 17, 5th cross, 6th Main,
Jnana Jyothi Nagar,
Bengaluru -560056.

Area : 2,62,230 Sft.
Time / Completion : 18 Months / 2019

 

Phase 2: Climaveneta


This building is built to suit the production of Air Conditioning, which has collection tank has an part of production area. It has a Mezzanine having a 2 levels which is used has an office, we have provided 2 number of trolley track rails which are unique. It has a 2 Gantry cranes 12 to 14 Ton capacity each. The VDF Floor is polished to make it dust free.

Keerthi Pradhan Logistic Park,
Narasapura,
Kolar District.

G S Venkatesh,
Engineering Consultant,
102-F, #5,6A Cross, Rajmahal Villa Extension,
Sadashivanagar, Bengaluru – 560000.

Cruthi Consultants Consortium Pvt. Ltd.,
Ramleela Mansion,
#204,2nd Main, 4th Block Rajajinagar,
Bengaluru - 560010.

Area : 83,000 Sft.
Time / Completion : 18 Months / 2019